US Citizen
Green Card
EAD (OPT/CPT/GC/H4)
H1B Work Permit
Corp-Corp
W2-Permanent
W2-Contract
Contract to Hire
Consulting/Contract
UG :- - Not Required
PG :- - Not Required
No of position :- ( 1 )
Post :- 21st Sep 2023
Contractor’s Key Person shall:
· Specific tasks completed by Contractor (including new and modified code tasks);
· Specific tasks related to defects within ADOS that were reported, resolved, and unresolved;
· Description of sprint activities with percentage complete;
· Description of planned sprint activities not completed;
· Description of project issues, risks or concerns that occurred or were worked during the reporting period;
· Sprint goals planned for the next reporting period; and
· List of daily updates made on assigned tasks within ADOS for the reporting period.
· Technical specifications to include updates and updated tasks for ADOS inventory. The Technical Specifications must include database changes, changes to interface programs (both batch as well as online), and all use cases.
· Created and updated unit test plans, as needed.
· Created and updated unit test scripts.
· New and modified code for sprint activities completed and in-progress.
· Documentation of the review of all code changes with technical/system subject matter expert.
· Updated application code including modifications per the accepted technical and design documents.
· Updated applications from merged code sets.
· Updated code change analysis documentation.
· Write initial Technical Specifications (version 1.0)
· Review existing Technical Specifications
· Update existing Technical Specifications
· Validate existing or Contractor-drafted Technical Specifications to make sure they address the requirements specified in the requirements and design documents for applicable Application(s).
· Report at the conclusion of the WOC.
· Contractor shall deliver technical specifications documents, which must include all the components specified in the Technical Specifications document template. Authorized Agency may revise the document template as needed.
o The report must be a compilation of all the Technical Specifications submitted in the sprints in one cohesive package. This report must reflect all the Application changes made by Contractor, during the length of the WOC.
· Contractor shall complete program code changes identified in the Sprint Planning meetings and documented in the accepted updated Technical Specifications Contractor prepared. Contractor must follow standard version control, configuration management principles, and SDD standards while making code changes. Contractor shall provide interim documentation of code modifications as part of the relevant Report Package.
· Write and review test plans and test scripts for applicable application(s), including necessary changes to match the current accepted Technical Specifications.
· Perform unit testing to ensure requirements are met and changed code works as specified.
· Document, in ADOS, any system any issues identified in testing and changes made to resolve the issues. Testing must be completed successfully for the related task to be acceptable and the task completed.
· Provide interim documentation of technical specifications as part of the relevant Report Package for Authorized Agency review and acceptance, and deliver cumulative, final technical specifications at the conclusion of all Tasks for applicable Legacy Application(s).
In addition to above mentioned tasks, the key person will:
1. Unit Test Plan. Contractor shall provide a comprehensive unit test plan that will at a minimum lay out all major activities associated testing the code changes made by Contractor. The test plan must include scope of the changes, testing environment and the associated tasks completed.
2. Unit Test Scripts. Contractor shall provide test scripts that reflect the detailed instructions for successful system testing completed by Contractor. The report must document the system functions in accordance with Authorized Agency accepted requirements and design after all the code changes are done.